PRE-STARTUP CHECKLIST

 

Note: FOR LONE STAR TURBO STARTUP SERVICES, PLEASE COMPLETE THE FOLLOWING FORMS AND SUBMIT TO LONE STAR TURBO. PLEASE ALLOW 4 WEEKS FOR SCHEDULING OF LONE STAR PERSONNEL.

ATTACH ALL REQUESTED PHOTOS TO END OF THIS REPORT

NOTE: Please take the time to complete our pre-startup checklist below. Thank you for your business and have a great day!


ANY DEFICIENCIES NOTED BY LONE STAR WILL BE SENT TO CUSTOMER AND WILL NEED TO BE ADDRESSED BEFORE STARTUP IS APPROVED OR STARTUP SERVICES ARE PROVIDED BY LONE STAR PERSONNEL.

Client Details

ATTACH ALL REQUESTED PHOTOS TO END OF EACH SECTION OF THIS REPORT

IO&M

INSTALLATION

Please include wide vantage photo(s) of unit installation.

FOUNDATION

Specification requirement is 1/16” per foot slope or maximum of 1/8” over length and width of base, whichever is less. Please include picture(s) of foundation and measurements.
Drag & Drop Files, Choose Files to Upload, or Capture With Your Camera You can upload up to 20 files.
Please include picture(s) of vibration pads with machine in place.
Drag & Drop Files, Choose Files to Upload, or Capture With Your Camera You can upload up to 20 files.
Please include picture(s) of locating studs with machine in place.
Drag & Drop Files, Choose Files to Upload, or Capture With Your Camera You can upload up to 20 files.
Drag & Drop Files, Choose Files to Upload, or Capture With Your Camera You can upload up to 20 files.

PIPING

INLET PIPING

Drag & Drop Files, Choose Files to Upload, or Capture With Your Camera You can upload up to 20 files.
Please include picture of inlet piping with all components installed

inlet-valve-location

DISCHARGE PIPING

Drag & Drop Files, Choose Files to Upload, or Capture With Your Camera You can upload up to 20 files.
Please include picture(s) of discharge piping with all components installed

PRE-STARTUP

NON-INSTRUMENT ACCESSORIES

Please include picture(s) of filter assembly installed on blower.
Drag & Drop Files, Choose Files to Upload, or Capture With Your Camera You can upload up to 20 files.

BLOWER CONDITION

Please include picture(s) of drive system installed on blower.
Drag & Drop Files, Choose Files to Upload, or Capture With Your Camera You can upload up to 20 files.

LUBRICATION SYSTEM

Drag & Drop Files, Choose Files to Upload, or Capture With Your Camera You can upload up to 20 files.

Motor

Note: Grease lubricated blowers do not require additional grease at startup unless authorized by Lone Star Turbo personnel.
Drag & Drop Files, Choose Files to Upload, or Capture With Your Camera You can upload up to 20 files.

STARTING/RUN EQUIPMENT

Drag & Drop Files, Choose Files to Upload, or Capture With Your Camera You can upload up to 20 files.

INSTRUMENTATION

Drag & Drop Files, Choose Files to Upload, or Capture With Your Camera You can upload up to 100 files.

Authorization Signature

I confirm that this blower and related equipment are fully installed and ready for startup by Lone Star Turbo personnel or designated representatives. Furthermore, I understand that any delays incurred because of incomplete or incorrect installation will result in additional charges per Lone Star Turbo’s published field service rates.
Clear Signature